Service
Contact
Service times
Mo - Fr: 9:00 - 18:00
Sa: 9:00 - 14:00
Select delivery country
The TRESPA® PURA NFC® façade panels beautify your façade with a premium solution in the form of natural fibre composite, a natural fibre composite in which layer pressings of wood fibres using a high-pressure process make the material extremely robust against extreme weather conditions. At the same time, the full gloss of the surface remains for decades without the need for tedious maintenance work.
*depending on construction method and local requirements
Trespa International B.V. is an established global market leader in exterior cladding panels, decorative facades and HPL panels. The global player has its headquarters in Weert, the Netherlands, and focuses strongly on innovation and sustainability in its product development, resulting in the exceptionally high performance of Trespa products.
item no. | TP00796173 |
---|---|
Manufacturer | TRESPA |
suitable for | Wall, Gable, Base |
Look | Wood effect |
Length in mm | 3050 |
Width in mm | 186 |
Thickness in mm | 8 |
Material | HPL |
Colour | grey |
Piece per package | 4 |
Warranty | 10 Jahre |
EAN | 8713882500255 |
Gloss level | matte |
Shipping group | XL |
Deck size | 3050 x 179,5 mm |
Absolute dimensions | 3050 x 186 mm |
Construction | Facade panels |
Laying direction | horizontal, perpendicular |
Laying | Trespa Pura NFC cladding panel can be used vertically or horizontally. A high level of scratch and impact resistance combined with the appropriate accessories, guarantees problem-free installation. The panels are ready to use, but can be easily machined and cut if necessary. |
Fastening | SFS INTEC HPL facade screw made of V2A stainless steel 4.8x38mm Universal clip incl. screws made of aluminium RVS A2 33.5x30mm |
Number of fasteners | HPL façade screw Requirement approx. 2-3pcs./façade panel and approx. 11pcs./m²Universal clip incl. screwsRequirement approx. 10-15/m² |
Surface | leicht strukturiert |
Weight | 25,42 kg/Packing |
Package Content | 2.27 m² |
Show all data ▼
|
We will help you with your questions!
A specialist adviser will be happy
to advise you personally.
Variant: DIY-Instruction
In order for the facade to have the desired longevity, it is essential that the substrate is load-bearing. The building can also be insulated before the facades are applied.
ATTENTION: Please maintain at least 30 cm ground clearance for splash water protection on wooden buildings.
Before installation, it is imperative that the official installation instructions, which are included in every package, are followed, otherwise all warranty and guarantee claims will be void!
Before attaching the substructure, first, make markings to determine the positions of the battens and then mount them. Also, plan corner or end profiles at the corners and dowel the profiles to the masonry. To ensure that the facade is also well ventilated, drill ventilation holes in the battens. The battens are now placed at a maximum distance of 65 cm from each other. Also plan for board joints and edge distances and double-fix the substructure at the joints.
Tip: You can attach grids to the gable and base to protect them from small animals.
Mark all the positions of the Starclips with the help of a chalk line and place the Startclips in a well aligned position. Stick the Compriband onto the end profiles and screw the profiles to the corners of the building. Small animal grids can also be attached to the base termination as protection. Now the facade cladding can be attached. With the help of a rubber mallet, you can fix the next rows to the already mounted facade.
ATTENTION: Please note that edge distances of approx. 10 mm should be observed.
Material:
Tools:
optional:
Are you looking for a lower price? Just ask us for an individual offer!