Choose Shipping Country
Living World
My Account
Search

Handle E300D satin stainless steel - bathroom with clip-on rosettes

› Technical Details
item no. E300DBAD71
Weight 0,600  kg

Request a quote now

planeo

UVP 65,95 €

60,45 €
1,00 pcs for 60,45 €
incl. VAT - plus €4.95 shipping costs for DE  XS

Your delivery date: until Thursday 28. March

  • Storage at the desired date - free of charge for up to 3 months3
  • Customer service until 6pm¹ - personal & close
  • DIY Videos - DIY instructions
Description
 

planeo is the brand for professional solutions with tested quality. In our extensive range, you will find first-class products for home and garden, from floors to wall coverings to decking: we offer you suitable items with a top price-performance ratio for almost every requirement and budget. We also have product lines such as carpets, wall paints, wallpapers and doors. The range of attractive offers for walls, floors and patios is rounded out by high-quality accessories and effective cleaning and maintenance products. Meanwhile, planeo's services go beyond the trade in floor coverings. We put great emphasis on the idea of service in everything we do. We deal with the topics of material, handling and realisation in such detail that we can provide you with an adequate solution for many different situations on the building site. To make things more clear, you can find useful tips and instructions in our guides with articles and videos. Beautiful flooring and more? Realise easily with planeo.



Technical Details
item no. E300DBAD71
Doorstop door left
EAN 4038847051585
Hinge 2-teilig (Standard)
Manufacturer planeo
Piece per package 1
Shipping group XS
Type Handles
Weight 0,60 kg/Packing
Package Content 1 Pc

We will help you with your questions!


A specialist adviser will be happy
to advise you personally.


☎ +49 5222 960 4810
Mon - Fri: 9am - 6pm
Sat: 9am - 2pm

Product questions

Door assembly instructions

Variant: DIY instructions

button
1. Measure the door

The first step is to acquire accurate measurements in order to order the correct door. Check the wall's level using a spirit level. Begin by determining the height from the floor. Then, in the finished state (with plaster and covering), measure the wall thickness at three points: top, middle, and bottom. Apply the same logic to the other side. Finally, the width of the door is measured at all three places. Determine the door hinge once the measurements have been determined and noted.

ATTENTION: If the floor has not yet been constructed, add the construction height of the floor to the measurement to ensure that the door is the correct height. When measuring the breadth, the width of the tiles on the wall is also considered.

button
2. Acclimatisation & preparation

The door and all other components should be stored horizontally in the packs in the room where they will be assembled for at least 48 hours before assembly. This allows the material to adjust to ambient temperature and reduces the amount of "labour" required after installing. Before processing, arrange the components. Open the packages carefully so that the cutter knife does not damage the door/frame.

Before laying, the official assembly instructions provided in each item must be followed, or any warranty and guarantee claims will be null and invalid!

button
3. Mount the frame

To assemble the frame together, first glue and screw the various pieces together. Connect the two frame components by placing the wooden plates into the joints after applying adhesive to the mitred surfaces of the longitudinal and transverse linings. Insert the connector into the hole in the frame and tighten it with a screwdriver. Metal clips are then used to secure the elements. A wet cloth can be used to remove excess glue. This is then done on the opposite side. The structure is then installed around 3 mm above the floor to protect it from moisture (e.g. cleaning water). As soon as it is in position, use a frame clamp to align it and foam it using 2-component foam. The clamps can be removed after curing. The ornamental cladding is now fixed and in place.

Tip: As an alternative to the clamps, you can also work with wedges and wooden slats.

button
4. Hang the door

You can hang the door after installing the frame and ornamental panel and inserting the hinges. Install the hinges. Remove the door's storage feet and hang it on the hinges provided.

button
5. Mount handles

The door handles are finally installed. Drill holes for the door handles using the provided drilling pattern. On both sides, drill a rough fray. The fittings are then carefully inserted and assembled. Finally, insert the plunger and install the ornamental panel.

To make your own, you will need this

Material:

  • Door
  • Frame
  • Hinge V4400 (for doors with 3-part hinge)
  • Handle set
  • Glue
  • 2-component assembly foam

Tools:

  • Door clamp
  • Cordless screwdriver
  • Hammer
  • Hex key
  • Spirit level
  • Screwdriver

Individual offer?

Are you looking for a lower price? Just ask us for an individual offer!

Inquery

We use your data exclusively for contacting you and processing your request. By sending the contact form you agree that your data will be stored and processed electronically for possible queries. We will not pass on your data to third parties. You can withdraw your consent at any time with effect for the future. Please note our data protection declaration.

* Required Fields

Inquery

We use your data exclusively to contact you and process your request and, if necessary, to prepare an offer. By sending the contact form you agree that your data will be stored and processed electronically for possible queries. We do not pass on your data to third parties. You can withdraw your consent at any time with effect for the future. Please note our data protection declaration.

* Required Fields