We just need your E-Mail and shipping address.
Feel free to add more samples to your sample cart afterwards.
We just need your E-Mail and shipping address.
Feel free to add more samples to your sample cart afterwards.
From the time it was founded in 1977, Parador has consistently set flooring standards. With the first engineered wood floor with the patented AUTOMATIC-CLICK system, Parador launched a real innovation on the market in 2000. Today, the company based in Coesfeld is active in 65 countries worldwide and has 600 employees at 3 locations. In total, the Parador product range includes more than 2500 products for floor and wall design, which fully live up to the Parador motto "living performance". The Parador range includes high-quality vinyl floors, engineered wood, laminate, carpets, wall and ceiling panels, screens and more. These are produced under environmentally friendly and sustainable conditions by trained specialists in Germany and Austria. Parador thus offers its customers premium quality "Made in Germany" and "Made in Austria" products. Several international awards, including the Red Dot Design Award 2009, the AIT Award 2011 and the Interior Innovation Award 2011, attest the high quality and innovative nature of Parador products.
item no. | 1739907 |
---|---|
Manufacturer | Parador |
Length in mm | 2200 |
Width in mm | 185 |
Thickness in mm | 13 |
installation pattern | Plank pattern (1-plank) |
Installation type | click |
Sorting (grain) | lively/rustic |
Wood type | Oak |
Surface treatment | oiled |
Underfloor heating | suitable |
EAN | 4014809196921 |
Collection | Classic 3060 |
Joint | Micro bevel |
Piece per package | 9 |
Shipping group | L |
Slip resistance | R9 |
Structure | 3-layer |
Wear layer | 3,6 mm |
Weight | 29,28 kg/Packing |
Package Content | 3.66 m² |
Show all data ▼
|
|
Downloads | |
![]() |
|
![]() |
We will help you with your questions!
A specialist adviser will be happy
to advise you personally.
Variant: DIY-Instruction
The subfloor should be permanently dry, load-bearing and even.
ATTENTION: Never lay parquet over a soft subfloor, e.g. over carpet, cork or any type of foam underlay.
The planks should be stored horizontally in the room where they are to be installed for at least 48 hours before the installation in the packages. This will allow the material to acclimatise to the room temperature and not "work" so hard after the installation.
Before laying, it is imperative that the official laying instructions, which are included in each package, are followed, otherwise any claim to warranty and guarantee will be invalidated!
Then clean the surface to be laid with a hoover. Any unevenness exceeding 3 mm per linear metre is sanded down and filled with a floor levelling compound.
Click:
Spread out the PE foil with an overlap of approx. 10 cm and tape it down.Now you can lay out the strips of impact sound insulation butt to butt against the laying direction of the floor covering and fix all overlaps with aluminium tape. The foil side should always face upwards.
Tip: Open several packages of the parquet at the same time and mix the planks to achieve an optimal installation pattern.
Lay the first plank well aligned on the subfloor, taking the edge distances into account. You can start laying the floor on the left side of the room. In the first row, the plank is clicked in with the front side. Use a rubber mallet to tap lightly on the front side so that the click connection snaps in well. In the next row, the planks are first clicked in with the long side and then the ends can be fixed by tapping lightly. To cut a plank, now take measurements and mark the plank. This is then cut with a jigsaw or crosscut saw.
ATTENTION: There must always be a gap of approx. 10 mm between the flooring and the wall and between the flooring and all fixed components.
Cut the planks of the last row to size and click them in place using a pull iron. Finally, the planks can be tapped down again with a hammer.
The PU foil is now cut approx. 2 cm high and the skirting boards can be fitted. Here there is the click or glue variant.
Glue:
Lay out the first two rows of planks and make marks in the subfloor with a pencil. The planks can be cut to size using a crosscut saw.
Tip: Open several packages of the parquet at the same time and mix the planks to achieve an optimal installation pattern.
Now pick up the planks again and apply the adhesive up to the marking with a notched trowel. Align the first plank and place it in the wet bed. The second plank is clicked into the already lying plank with the front side. The boards of the next row are laid first with the long side, then with the short side. Then the adhesive for the next two rows can be applied and the planks can be glued.
ATTENTION: There must always be a gap of approx. 10 mm between the flooring and the wall as well as to all fixed components.
Finally, you can attach the skirting boards.
Material:
Click version:
Adhesive variant:
Tools:
optional:
Working time:
Level of difficulty:
Are you looking for a lower price? Just ask us for an individual offer!