With the high-quality floor coverings from HARO, Germany's leading manufacturer of parquet floors, you quickly feel at home. Thus it is no surprise, of all things, that the company's slogan is "At home at last.". Because HARO floors conjure up a homely atmosphere in your rooms that inspires.
The owner-managed family business from Bavaria was founded in 1866 as a wood processing company. The subsidiary Hamberger Flooring GmbH is responsible for all HARO activities in the laminate, parquet and cork flooring sector. Customers in over 90 countries worldwide trust the impeccable quality of exquisite HARO brand floor coverings.
Tradition and innovation go hand in hand in the production of HARO's high-quality floors. Raw materials from certified, sustainably managed forests are processed into exclusive floors using innovative manufacturing processes. In 2010, the sustainable actions of Hamberger Industriewerke resulted in HARO becoming the first parquet brand in Germany to be 100% PEFC certified. The added comfort in installation, maintenance and use of HARO floors produced in Germany is also confirmed by the well-known "Made in Germany" label.
item no. | 541006 |
---|---|
Manufacturer | Haro |
Length in mm | 2200 |
Width in mm | 180 |
Thickness in mm | 11 |
installation pattern | Plank pattern (1-plank) |
Installation type | glue |
Surface treatment | oiled |
EAN | 4018427469504 |
Collection | Serie 4000 |
Piece per package | 9 |
Shipping group | L |
Structure | 2-layer |
Wear layer | 3,5 mm |
Weight | 22,64 kg/Packing |
Package Content | 3.56 m² |
Show all data ▼
|
We will help you with your questions!
A specialist adviser will be happy
to advise you personally.
☎ +49 5222 960 4810
Mon - Fri: 9am - 6pm
Sat: 9am - 2pm
Variant: DIY-Instruction

The subfloor should be permanently dry, load-bearing and even.
ATTENTION: Never lay parquet over a soft subfloor, e.g. over carpet, cork or any type of foam underlay.

The planks should be stored horizontally in the room where they are to be installed for at least 48 hours before the installation in the packages. This will allow the material to acclimatise to the room temperature and not "work" so hard after the installation.
Before laying, it is imperative that the official laying instructions, which are included in each package, are followed, otherwise any claim to warranty and guarantee will be invalidated!

Then clean the surface to be laid with a hoover. Any unevenness exceeding 3 mm per linear metre is sanded down and filled with a floor levelling compound.
Click:

Spread out the PE foil with an overlap of approx. 10 cm and tape it down.Now you can lay out the strips of impact sound insulation butt to butt against the laying direction of the floor covering and fix all overlaps with aluminium tape. The foil side should always face upwards.
Tip: Open several packages of the parquet at the same time and mix the planks to achieve an optimal installation pattern.

Lay the first plank well aligned on the subfloor, taking the edge distances into account. You can start laying the floor on the left side of the room. In the first row, the plank is clicked in with the front side. Use a rubber mallet to tap lightly on the front side so that the click connection snaps in well. In the next row, the planks are first clicked in with the long side and then the ends can be fixed by tapping lightly. To cut a plank, now take measurements and mark the plank. This is then cut with a jigsaw or crosscut saw.
ATTENTION: There must always be a gap of approx. 10 mm between the flooring and the wall and between the flooring and all fixed components.

Cut the planks of the last row to size and click them in place using a pull iron. Finally, the planks can be tapped down again with a hammer.

The PU foil is now cut approx. 2 cm high and the skirting boards can be fitted. Here there is the click or glue variant.
Glue:

Lay out the first two rows of planks and make marks in the subfloor with a pencil. The planks can be cut to size using a crosscut saw.
Tip: Open several packages of the parquet at the same time and mix the planks to achieve an optimal installation pattern.

Now pick up the planks again and apply the adhesive up to the marking with a notched trowel. Align the first plank and place it in the wet bed. The second plank is clicked into the already lying plank with the front side. The boards of the next row are laid first with the long side, then with the short side. Then the adhesive for the next two rows can be applied and the planks can be glued.
ATTENTION: There must always be a gap of approx. 10 mm between the flooring and the wall as well as to all fixed components.

Finally, you can attach the skirting boards.
Material:
Click version:
- Parquet
- Vapour barrier
- PE foil
- Aluminium tape
Adhesive variant:
- Parquet
- Adhesive
Tools:
- Professional cutter knife
- Spirit level
- Pulling iron
- Pencil
- Rubber mallet
- Tapping block
- Measuring tape
- Spacer
optional:
- Skirting boards
- Template for herringbone pattern
Working time:
- Clicking: for a room size of 15-20 m² approx. 4-5 hours.
- Gluing: for a room size of 15-20 m² approx. 6 hours
Level of difficulty:
- Clicking: easy
- Gluing: difficult
Individual offer?
Are you looking for a lower price? Just ask us for an individual offer!